top of page

PROJECTS

▪ Ronesans – Marmaris - Sand Shore Construction

 

▪ USTAOGLU Shipyard Capacity Enlargement Project – Consultancy of Tendering Documents Preparations

 

▪ Opet–THY 16’’ Steel Jet-oil Pipeline free span & backfilling maintenance

▪ POAS Derince Facitlity removal of 2 x120 Ton CBM removal

▪ NEFES Denizcilik – Transportation & Mooring of Karakoy Ferry Pier From Tuzla to Karaköy

▪ IC KARASU PORT – Ship Underwater Survey (Turk Loydu) Works

▪ SIYA SHIPPING – Ship Underwater Survey Works

▪ MARPORT – Berth and Seabed Survey

▪ EREN CCPP ‐ Discharge Line and Cathodic Protection Survey

▪ THY OPET - Flexible Hose Testing

 

▪ VODAKANAL - Sochi Olympic City DN2000 HDPE Discharge line Inspection

▪ THY OPET – Maintenance works of U/W Pipeline

▪ AYSON – SOCAR Aliaga Refinery – Underwater DN 1600 Steel Pile Maintenance

▪ AYSON – SOCAR Aliaga Refinery - Splash Zone Pile Protection by DENSO SeaShield HD2000

▪ ENERJISA – BAN 1 CCWP Maintenance (Intake, Diffuser, Buoy, Pump House, Cathodic)

▪ ENGIE & UNIMAR CCPP - 2017 Fall Cooling Water pipelines Maintenance Intake & discharge CTP (Borinfinite & Borinline installation )

▪ LIMAR – Mardas Port Jetty Underwater NDT ( VT & UT )

▪ Eregli Municipality – Zonguldak Karadeniz Eregli Port Maintenance

 

▪ Ayson-İzmir Aliağa PETLIM Cathodic Protection Underwater Welding & Installation (Tuartek)

 

▪ Ayson – SOCAR Aliaga Refinery – Underwater Anode Welds (Tuartek)

 

▪ ARTI Proje ‐ Bodrum Yalıkavak PALMARINA – Splash Zone & Underwater Survey –UT&VT

 

▪ SETUR – Oren SETUR MARINA – Corrosion Survey – NDT‐ CP & VT

 

▪ BORTEK – Kocarli Baharasi DN3500 Internal Seal Borinline & Borinfinite

 

▪ Dogus & ES‐ Star Aegean Refinery ‐30m silt Curtain Survey & Maintenance

 

▪ Dogus & ES‐ Star Aegean Refinery – Turbidity Buoy Maintenance

 

▪ BORTEK‐ Kocarli Baharasi Irrigation Lines DN3500 GRP Pipe Internal Seal Maintenance

 

▪ ASSAN – İskenderun Assan Port Piers Concrete & Pile Maintenance (DENSO)

▪ BUTANGAZ A.S.  Marmara Eregli Terminal LPG  Pipelines & ACBM Mooring Systems Inspection & Maintenance – Since 2011

 

▪ DSV Alcatras Salvage – KOS Island

 

▪ GOLCUK NAVY FLEET – Prohibit Zone 2500 m Border Buoys Installation

 

▪ BUTANGAZ LPG Terminal – Pipeline & Mooring Buoys Inspection & Maintenance

 

▪ UNIMAR 480 MW CCPP ‐ 2016 FALL CCPP MAINTENANCE – GRP ‐ INTAKE & OUTLET

 

▪ SOCAR – Cathodic Protection Installation (Underwater Welding) ( DOGUS/AYSON )

 

▪ ASSAN PORT – Underwater NDT – UT for Iskenderun Jetty ( All Piles)

 

▪ BESIKTAS SHIPYARD – Installation of New Dry Docks & Mooring Systems

 

▪ JAN DE NUL – Removal Of The abandoned DN1000 discharge pipeline DN1000

 

▪ PYRAMID ‐ YALOVA RO‐RO Construction‐ Inspection & Removal Of Buried Piles

 

▪ UNIMAR 480MW CCPP SPRING MAINTENANCE – INTAKE GRP 2500 PIPELINE

 

▪ JAN DE NUL – DN1000 Discharge Pipeline Inspection ( Istanbul Airport )

 

▪ ASSAN PORT – Pier/Jetty Splash Zone Repair Jobs ( PE Coating , Jetty Concrete )

 

▪ SOCAR – Aegean Refinery – Pile Removal by Underwater Thermal Cutting (Dogus/Ayson)

 

▪ SOCAR – Aegean Refinery ‐ Underwater NDT‐ ACFM Inspection ( DOGUS /AYSON )

 

▪ MEDCEM ‐ Splash Zone Jacked Protection Installation ( DENSO SEASHIELD )

 

▪ Karadeniz Eregli Municipality – Water Front Dock Inspection

 

▪ BUTANGAZ – CBM Maintenance , ( Buoy, Mooring Systems replacement)

 

▪ ENERJISA – Periodic Underwater Pipelines & Intake Structures Survey + Buoy Maintenance

 

▪ AYSON –Galataport Underwater As Built Project Inspection of Jetty Piles

 

▪ UNIMAR CCPP –  Intake Pipelines Internal Seal Installation  & Epoxy Application DN2100 / DN2400 ( BORINLINE INTERNAL SEAL )

 

▪ Artı Engineering – Seafront Structures VT Inspection

 

▪ THY&OPET ‐ Jet Fuel Yesilkoy Terminal – Marine Terminal Services (2016 Full Year Service )

 

▪ Istanbul Shipyard – TSK HP Transfer Chamber ‐220mt Testing

 

▪ ARAS Salvage – CS JADEN Patch Welding Operation

▪ Korfez Deniz – 2x Barge Underwater Turkish Lloyd VT Survey

 

▪ Korfez Deniz – Split Barge Underwater Turkish LLOYD VT Survey

▪ Evren Zincir – Golcuk Navy Floating Barrier Project Sea Bed Survey

 

▪ Ambarli TPP – Water Intake Structures Scour & Dredging Maintenance

 

▪ ASF & BORDO – JET CHAMBER Demolition by Wire Cutting for Discharge Line Const.

 

▪ ASSAN PORT ‐ SPLASH ZONE VT Inspection for Tendering ( Steel Piles & Concrete )

 

▪ Artı Muhendislik –Camialti Tersanesi Dock Yard , PIER VT Inspection ( concrete ; Steel Piles)

 

▪ HABAS Aliaga – Dock VT Inspection ( Old & New Pier ; Steel Piles & Concrete)

 

▪ KORFEZ DENIZ – BORUSAN West & East Pier VT Inspection ( Steel Piles, Concrete )

 

▪ KAPTAN DENIZ – 1300 MW EREN TPP Intake Pool Demolition by Wire Cutting

 

▪ KAPTAN DENIZ – 1300 MW EREN TPP DN3500 GRP Pipeline Construction

 

▪ KAPTAN DENIZ– 1300 MW EREN TPP 25 pieace 60 Ton T Wall Installation

▪ S&Q Mart – ASSAN PORT NDT UT Inspection of Steel Piles

▪ Dogus & Es – Albedo – 5000 m3 dredging work

▪ Dogus & Es – SOCAR AEGEAN REFINARY 200mt -30m Silt Curtain Installation

▪ TUPRAS – B DOCK – Demolition of Concrete Blocks after Dredging Project

 

▪ STFA&KORFEZ / TUPRAS ‐ AYGAZ 5x160 Ton ACBM Buoy Mooring System Removal

 

▪ EREN CCPP‐ Marine Transportation Services ( 360 Ton Gas Turbines )

 

▪ YMSK & JV  – AVRASYA TUNNEL TBM Excavation – Cutter Head Hyperbaric Maintenance ‐ Saturation Diving 11,8 Bar

 

▪ HICC‐ Vlore ‐Albania Oil Platform NDT Survey, Oil Pipelines VT Survey

 

▪ ARAS/ STFA & IHI‐ Osman Gazi Bridge Construction – Marine Piloting Services

 

▪ NORDSEETAUCHER – China Communication SHENZEN & NANJING Metro Road Tunnels TBM Excavation – Cutter Head Hyperbaric     Maintenance

▪ ASELSAN – MARINE TESTS OF INNOVATIONS

 

▪ BUTANGAZ A.S. Marmara Eregli Terminal LPG Pipelines & ACBM Mooring Systems Inspection & Maintenance – Since 2011

 

▪ Install Sub – BP BTC Ceyhan Terminal – Diving Services

 

▪ ISPARK / AQUAMARINE ‐ISTINYE MARINA Floating Pontoon & Mooring System Installation

▪ GDF SUEZ ‐480 MW UNIMAR CCPP – DN2500/2400 Grp Cooling Water Pipeline Inspection & Maintenance

▪ GDF SUEZ ‐480 MW UNIMAR CCPP   –DN2500/2400 Internal Seal Maintenance & Replacement

 

▪ SENTEZ  ‐&  KANDILLI  Observatory  and  Earthquake  Research  Institute  –  Maintenance Of Earthquake and Plate Motion   Measurement Instruments Planting at - 1600 mt in Marmara Sea Ridge

 

▪ M\V MAGDA P MMA ‐ Cathodic Protection Replacement

 

▪ DELTA RUBIS Oil & Gas Terminal – Berth Piles Maintenance ‐Underwater Habitat Welding

 

▪ BAYRAKTAR INSAAT ‐ Tuzla Marina Precast Blok ‐ Berths Construction

 

▪ BUTANGAZ A.S.  Marmara Eregli Terminal ACBM Mooring System LPG Flexible Hose Maintenance & Replacement

 

▪ METKA ‐ 870 MW OMV SAMSUN CCPP – Cooling Water Pipelines Inspection & Maintenance ( DN2100 Internal Seal Application)

 

▪ TOTAL‐ Aliaga Terminal Cathodic Protection Works (Anot Welding & Sea Shield Application)

 

▪ YMSK & JV – AVRASYA TUNNEL TBM Excavation – Cutter Head Hyperbaric Maintenance

 

▪ STFA & KORFEZ / TUPRAS ‐ AYGAZ 160 Ton  ACBM Buoy Mooring System Removal

▪ BUTANGAZ A.S. Marmara Eregli Terminal ACBM Mooring Buoys / LPG Pipelines / Flexible Hose Periodical Inspection & Maintenance    Since 2011

 

▪ STFA & KORFEZ / TUPRAS SECTION B –Removal Of Existing Berth & Pile Demolition

 

▪ NORDSEETAUCHER – China Communication SHENZEN & NANJING Metro Road Tunnels T B M Excavation – Cutter Head Hyperbaric     Maintenance

▪ 940 MW ENERJISA BANDIRMA CCPP – DN2400/2200 Cooling Water Pipelines & Water Intake Structures ‐ Periodical Inspection &   Maintenance

 

▪ SENTEZ & KANDILLI Observatory and Earthquake Research Institute – Planting Of Earthquake and Plate Motion Measurement   Instruments  Planting  at  -1600 mt  in Marmara Sea Ridge

▪ METKA ‐870  MW  OMV  SAMSUNCCPP  Marine  GRP  Cooling  Water  Pipeline  Construction Marine Consultancy Since 2011

▪ METKA ‐870  MW  OMV  SAMSUNCCPP  Marine  GRP Cooling Water Pipelines ‐ Internal Seal Application DN 3200/2400

 

▪ METKA ‐870  MW  OMV  SAMSUNCCPP  Marine Operations ( Dive Support Vessel / Multi Cad Barge – Back Filling ACBM / GABION     works , Mooring       Systems )

 

▪ KUTAY‐ DSI TURKEY‐ CYPRUS Drinking Water Pipelines Internal Seal Application – DN1500 Ductile Pipes

 

▪ IKIHANLAR INSAAT‐ Artvin  DN250 HDPE Discharge Pipe Line Construction

 

▪ EUAS Ambarli Oil Rig/Platform, Leg Inspection & Maintenance

 

▪ Ustaoglu Shipyard ‐ MT MED PASIFIC Salvage with Balloon Method

 

▪ ORDU Discharge Line Backfilling Marine Works And Free‐Span Inspection & Maintenance

 

▪ ASELSAN – MARINE TESTS OF INNOVATIONS

 

▪ METKA  ‐  870  MW  OMV  SAMSUNCCPP  Marine  GRP  Cooling  Water  Pipeline  Construction Marine Consultancy Since 2011

 

▪ THY & OPET JET FUEL YESILKOY TERMINAL – Marine Terminal Services

 

▪ VODAFONE ‐ Uskudar / Kabatas 2,1 Km Fiber Optic Cable Maintenance and Re‐ Positioning

 

▪ PROJECT MARMARAY ‐ Demounting of Temporary Jetty near Maiden’s Tower ‐ 2010

 

▪ TURK TELECOM & KANDILLI Observatory and Earthquake Research Institute – Planting Of Real- time Monitoring Underwater   Seismic  Sensors at  depth  of - 1400 mt & 57 Km Fiber Optic Cable Laying in Sea of Marmara

 

▪ ISTANBUL GREAT CITY MUNICIPALITY Urban Transformation Project – Publicity - Floating  Stage Service

▪ OPET Antalya, Marine Terminal Construction

 

▪ TURKISH PETROLEUM A.O. – Breakaway Coupling Mounting

 

▪ BOTAS – Tekirdağ Marmara Eregli Wharf Construction

 

▪ NORTHERN CYPRUS TURKISH PETROLEUM A.S. ‐ 14’’ Steel Oil Pipeline Construction

▪ NORTHERN CYPRUS TURKISH PETROLEUM A.S.‐  Removal Of Stee l 8’’  &  12’’  Oil Pipelines Decommissioning & Demolition

 

▪ NATO Antalya Sea Terminal - Maintenance of Buoy System Chain Accessories

 

▪ M/V ZELEK STAR Salvage – 2010

▪ AE&E‐ENERJISA A.S. 940 MW  BANDIRMACCPP   DN   2400/2200 Cooling   Water GRP Pipelines Construction Consultancy

▪ AE&E‐ENERJISA A.S. 940 MW  BANDIRMACCPP   DN  2400/2200  GRP Pipelines Internal Seal Application

 

▪ NORTHERN CYPRUS TURKISH PETROLEUM A.S.  -  Installation and  De-installation  of Buoy Systems

 

▪ RMK Shipyard - Removal of 4 Section Of Landing Wharfs

 

▪ T.P.A.O. - Demounting Of Akçakoca Natural Gas Platform Buoyancy Floater Tanks 2009

 

▪ HAYAT-N Ro‐Ro Vessel Salvage

 

▪ MERSIN MESKI A.S. - Sea Outfall DN1800 GRP Cooling Water Pipeline Construction

 

▪ Pasabahce Sea Outfall Pipeline - Removal of The Diffuser Caps at depth of - 70m – Mix Gas

 

▪ MOMENTUM ‐ T.P.A.O. Akcakoca Oil & Gas Platform Hook‐Up Assistance/ Oil & Gas Pipeline ConstructionAssistance

 

▪ Bosphorus – Quay Construction Near Anatolian Castle – 2007

 

▪ VODAFONE A.S. – Fireworks At Bosphorus – 2007

 

▪ IMCA Dive Training Courses - S.T.F.A. And Bogaziçi (Bosphorus) Underwater Research Center - 2007

 

▪ BOTAS  Turkey-Greece  Natural Gas Pipeline Project  (Phase-2) Offshore Section  Rehabilitation of The Fiber Optic Cable and Pipeline   Cross sections - 2007

bottom of page